Tuesday

Construction: Problems With Initial Filming


After filming our opening of a horror movie we put together a rough edit:



Once we finished filming for the first time and we looked at our rough edit we realised that there was a lot wrong with it and that we could improve it massively.

Our biggest problem is the sound; in this plan we relied on diegetic sound (Lewis and Stephen) throughout and this is a huge problem because of the background noise and the wind causing the sound to be very bad; it was hard to hear them at points in the film and didn't build the tension we were looking for.

Another problem that we came across was that some of the clips had dirt on the camera meaning the shot didn't look clear or good meaning that all of these clips need to be re-filmed.

We have decided to completely change our storyline quite a lot and during the next filming we are going to make sure that we include a lot more camera shots, camera angles and camera movements throughout and also make sure that we remove all of the diegetic sound because it is too difficult to do that without the background noise and wind making the quality very bad, we are also going to include music to create the tension that we are looking for.

No comments:

Post a Comment